Tag:frequency converter

№3|2010

POWER SAVING

bbk 000000

UDC 628.12:62-531.3

KARGIN S. A.

Analysis of Electric Power Losses in the Course of Operation of a Group of Pumps Equipped with Adjustable Drive

Summary

Calculations of the power losses in pump units with aggregates operating simultaneously, one of them is adjustable, are presented. The main advantage of a control scheme with one adjustable pump is a relatively low cost of an apparatus part. But additional power losses connected with reduction of rotation frequency of a pump impeller of the adjustable pump in the course of operation of unregulated pumps under conditions of maximum output are unavoidable. Calculations of these losses made with the use of vector diagrams of hydraulic capacity of pumps make it possible to develop a structure of a power efficient pumping unut characterized by acceptable cost of equipment and minimal power expenditures to maintain the preset pressure in a pressure line.

Key words:

, , , , , ,

 

№8|2012

THE CENTENARY OF TCHELYABINSK MUE «WATER SUPPLY AND WASTEWATER MANAGEMENT PRODUCTION ASSOCIATION»

bbk 000000

UDC 628.3:62-531.3.003.13

Shadrin V. A.

Improving the energy efficiency

Summary

Retrofitting frequency converters at the water and sewage pumping stations of Tchelyabinsk MUE «Water Supply and Wastewater Management Production Association» as part of the «Program of energy conservation and efficiency improvement in MUE «Water Supply and Wastewater Management Production Association» for 2010–2014» is reported.

Key words

, , ,

 

№10|2019

ENERGY CONSERVATION

DOI 10.35776/MNP.2019.10.08
UDC 628.356.1:621.61

Iadrishchenskii A. N., Filippova N. N., Bulygin K. A., Kolobova G. I., Gordeichik A. V., Usachev A. P.

Reconstruction of the air blower station at the wastewater treatment facilities in Chita

Summary

The results of the reconstruction of the wastewater treatment facilities in the city of Chita are presented with regard to the system of supplying air to the operating sections of the aeration tanks without replacing the air blower units. The main goal of the reconstruction was energy saving and automation of air supply to the aeration tanks while ensuring sufficient oxygen concentrations in the wastewater biological treatment facilities. To change the capacity of the air blowers the automation system includes two high-voltage frequency converters for the number of blowers in operation. To regulate the air supply eight regulated valves and eight dissolved oxygen sensors (for the number of operating sections) are installed in the sections of the aeration tanks. Energy savings over four months of operation amounted to about 16.4% compared to the same period of previous years.

Key words

, , , ,

Скачать/download (PDF) free access

 