№6|2018

SURFACE RUNOFF TREATMENT

bbk 000000

UDC 628.33

Gandurina L. V., Kvitka L. A., Nikitin R. A., Ansimov A. D.

Effect of dispersion characteristics of suspended solids
on the parameters of surface runoff treatment

Summary

Quantitative and dispersion characteristics of insoluble pollutants in rainfall and snow-melt water and its effect on the parameters of removing pollutants from water by sedimentation, chemical free and chemical filtration are considered. It is shown that the concentration of suspended solids in surface runoff multiply exceeds the concentration of oil products whereupon these pollutants are present in the form of two-component particles. In the particles oil products or inorganic admixtures can be adsorbed components, and during sedimentation of surface runoff suspended solids and oil products are being removed synchronically. The concentration and kinetic consistency of suspended solids from residential areas are lower than those from highways; which reduces the sedimentation time in the storage settling tank and concentration of pollutants in settled water. During 1–3 days of settling tank empting monotonic reduction of suspended solids concentration in settled water before filtration occurs. Fluctuation range depends on the sedimentation time in the settling tank, initial suspended solids concentration and tank empting time. The use of coagulants before filtration of settled surface runoff from highways provides for improving the treatment efficiency and obtaining sustained quality of filtered water.

Key words

, , , , , , , ,

 

№1|2010

PROBLEMS, PERSPECTIVES

bbk 000000

UDC 628.162.5.001.2

Ganbarov E. S., Safarova A. S.

Treatment of Wash Water of Filters and Water Disinfection at Water Treatment Complexes of the Azerbaijan Republic

Summary

Results of studies carried out for determination of efficiency of clarification and investigation of influence of quantity and quality of the wash water supplied to a head of treatment facilities on the subsequent process of treatment are presented. For full disinfection of water it is proposed to use a disinfectant received by electrolysis of a solution of salts of alkaline metals and mineralized ground water directly at the territory of water treatment station.

Key words:

, , , , ,

 

№02|2015

WASTEWATER TREATMENT

bbk 000000

UDC 628.349

Adel'shin A. B., Adel'shin A. A., Grishin B. M., Bikunova M. V.

Oilfield wastewater treatment with the use of centrifugal apparatuses

Summary

The task of the studies was improving the efficiency of polydisperse oil particles removal from oilfield wastewater. The process is complicated with the presence of adsorption (inhibiting) shells of mechanical impurities on fine-dispersed oil droplets. A new technology of oilfield wastewater treatment is suggested that provides for wastewater pretreatment in hydraulic cyclones equipped with cylindrical (tubular) overflow chambers that allow stimulating the processes of oil droplets coalescence. The flow sheet of a pilot plant for studying the processes of emulsified oil droplets growth is presented. The plant comprises a hydraulic cyclone connected to the upper and lower overflow chambers. Oilfield wastewater of «Tatneft» OJSC was chosen as a test subject (oil concentration 710–800 mg/l). It was stated that the coalescence efficiency was determined by the vortex value parameter in overflow chambers and by the time of wastewater treatment in the centrifugal field. Processing the test results on the oil droplet size distribution showed that the optimal vortex parameter values for the upper overflow chamber of the hydraulic cyclone were within 20–23; whereas for the lower overflow chamber – 16–18.5. The recommended time of wastewater treatment in the upper and lower overflow chambers was relatively 24.5 and 18.5 seconds. It was experimentally determined that the residual oil concentration after oilfield wastewater treatment in the hydraulic cyclone and two hours sedimentation was less than 72 mg/l at 91% treatment efficiency. It was 6% higher compared with the wastewater sedimentation efficiency after treatment in the hydraulic cyclone only. The design of BGTO plant (hydraulic cyclone block – overflow chamber – sedimentation tank) is suggested that provides for the efficient treatment of oil effluents on industrial scale.

Key words

, , , , ,

 

№9|2012

DESIGN ENGINEERING

bbk 000000

UDC 628.3.001.2

Ponomarev V. G., Oulanovsky Ya. B., Korolyov M. A.

Designing wastewater treatment facilities

Summary

An approach to the selection of industrial wastewater treatment technologies and design calculations is considered. The authors analyzed the advanced design solutions with specifying their drawbacks and mistakes often made. The process solutions used in installations made by Stroyengineering LLC and practically approved during the onsite operation are described.

Key words

, , , ,

 

№7|2013

WASTEWATER TREATMENT

bbk 000000

UDC 628.35

Ponomarev V. G.

Design and implementation of wastewater treatment projects

Summary

The analysis of technical solutions of surface run-off treatment process flow schemes is presented. The attention is focused on the necessity of selecting a treatment system in every specific case relying on the analysis of wastewater type and local drainage system. In addition the technological orientation of the local industries discharging their effluents into the municipal sewer shall be considered. One of the possible solutions of the given problem is the expediency of treatment of industrial effluents discharged into the storm sewer at the local treatment facilities located on the surface in a separate building or box at the industrial enterprise's premises.

Key words

, , , , , ,

 

№10|2011

DRINKING WATER SUPPLY

bbk 000000

UDC 628.16.081.32:628.094.3-926.214

Shushkevich E. V., Babaev A. V., Smirnov A. V., Sourayeva N. O., Grigoryev A. S.

Improving the water treatment technology at the West water treatment plant

Summary

In January 2011 newly built ozonation and activated carbon filtration facilities with a capacity of 250,000 m3/day were put into operation at the West water treatment plant in Moscow. The facilities are fully automatic. Monitoring and control of the treatment process is carried out from the central control room. The technology of ozonation in combination with activated carbon filtration ensures high efficiency of organics removal (color, permanganate oxidability, total organic carbon), deodorization, and improvement of the drinking water taste, allows minimizing the formation of chlororganics (chloroform). The amount of water treated with new technology was 490,000 m3/day or 43% of the total supply to the city.

Key words

, , , , ,

 

№1|2012

WASTEWATER TREATMENT

bbk 000000

UDC 628.33:551.577.21

IVKIN P. A., MENSHUTIN Yu. A., Sokolova E. V., Fomicheva E. V., Kedrov Yu. V.

The efficiency of storm water treatment facilities of continuous flow type

Summary

The analysis of technical parameters and process efficiency of some modifications of continuous flow storm water treatment facilities manufactured by international and Russian vendors that have been widely used nowadays for storm and melt water treatment is presented. Continuous flow installations operate as part of a gravity storm water collection system without any accumulating tank under highly irregular hydraulic load conditions. On the basis of process calculations made according to the effective in RF design rules and norms as well as on the basis of the practical data analysis a number of essential process and design faults are revealed that account for low sanitary and environmental efficiency and high operating vulnerability of such installations during surface runoff treatment.